Day 2
Second day at the new house and we spent time vaccuuming out the mouse poop in the kitchen and scrubbing surfaces here and there. We were able to wash the walls, spackle, tsp clean and rinse a good portion of the living and dining room walls. Removed a lot of nails and unnecessary hardware from around the windows. We picked up two buckets of paint which should keep us busy through Sunday. Also set up 4 mouse traps upstairs.
Contractor is coming Saturday to look at the bathroom. Weve found a few more things that need attention in the main bathroom. The toilet shut off valve is so close to the floor that you can't use it, and the bathroom sink is leaking so badly that the cabinet under the sink needs replaced, but its not as pressing. We have a sink we'd like to use in there so we will see whats possible.
I dont think we will be able to have the electrician out for another week or so but Chris assured us that isnt as much of as a time bomb as one could think.