getting behind

I am very behind on getting a lot of things down here but its ok. We got a quote today finally of $2,400 to redo our downstairs bathroom. Not sure when work will begin. Still waiting on a quote from electrician. Tonight was the first night that Jillian was able to stay at the house and work while I was at work. Pretty much finished painting floors on the main floor. One of the windows fell out today. We really need to get in touch with whoever put them in for some repair. They're a mess.

We've begun digging post holes for the garden and laying piles of bed material in rows for the hugel Kultur. Started cutting out significant limbs off of some of the Siberian Elm and we will start using them for posts and inoculating some for mushroom cultivation.

I've learned that there is actually electricity to the garage, most of the outlets work but the garage door opener needs a lot of attention. Maybe this weekend now that its warmer will be a good time to work on that. 

We have booked a 26' moving truck for 4/1-4/3. We should be able to get a lot of moving done In 1-2 trips.

Chris has wrapped up work on the basement stairs and they're perfect. They extend out further than previously, which makes it hard to go downstairs without having to duck, but we are thinking maybe some day we can knock out the part of the wall that blocks that upper entrance.